Manassas

No County portion

ADU Pass helps homeowners in Manassas, No County, Virginia navigate the permit paperwork for building an accessory dwelling unit. This area covers 1 ZIP code.

1 ZIP code

ADU details

ADU legality: unclear

Statewith-restrictions (Virginia SB 531 (2026) — accessory dwelling units permitted by-right in single-family zoning statewide, effective July 1, 2027) — Governor Spanberger signed SB 531 on April 14, 2026, requiring all localities to permit ADUs in single-family zoning districts effective July 1, 2027, with a $500 permit-fee cap. Localities that adopted ADU ordinances on or before January 1, 2026 are exempt; Manassas had not adopted an ADU ordinance by that date (the Planning Commission deferred its 2024 draft pending state action), so Manassas likely does NOT qualify for the grandfathering exemption.
Countyunclear (City of Manassas is an independent city, not part of any county) — City of Manassas is one of Virginia's 38 independent cities. Population approximately 42,772 (2020 Census); legally separate from surrounding Prince William County since attaining city status in 1975.
Cityunclear (City of Manassas Zoning Ordinance (under review); ADU ordinance proposed as part of Manassas 2045 Comprehensive Plan) — City Council adopted the Manassas 2045 Comprehensive Plan on October 27, 2025. Objective 4.5.4 recommends the City explore an ADU ordinance to provide a missing-middle housing type. The Planning Commission's Zoning Ordinance Review Committee has been drafting ADU amendments to the zoning code since 2022; final draft was anticipated September 2025 but had not been adopted as of late 2025. Until adoption, the city zoning code does not provide a dedicated ADU pathway and conversions of existing accessory structures conflict with the nonconforming-structure ordinance.

Manassas is in a transitional posture: ADU ordinance language was approved as comprehensive-plan policy October 2025 but the implementing zoning amendment had not been adopted as of late 2025. Historic Manassas Downtown (Historic Overlay District) imposes additional design-review requirements regardless of underlying zoning.

Cost scenarios

Fee breakdown (as of 2025-07)
Plan review$250
Building permit$1,900
Total$2,150

Permitting process

Typical duration65 days
Backlog16 days

Viability (permitted uses)

  • Long-term rental: unclear Without an adopted ADU ordinance, long-term rental of a secondary dwelling requires special-use permit interpretation; status may change with SB 531 implementation.
  • Short-term rental: unclear Manassas does not have a published STR ordinance; STRs face case-by-case zoning interpretation. Old Town Manassas historic district imposes additional review.
  • Office rental: no Office rental to third parties not permitted in single-family residential zones in Manassas.
  • Home office: with-restrictions Home occupation permitted with $25 zoning permit and restrictions on customer traffic, signage, and outside employees per zoning code.
  • Studio / workshop: yes Personal studio or workshop is a permitted accessory use within residential zones.
  • Agriculture: no City of Manassas is fully urbanized; no agricultural zoning. Manassas Battlefield Park is federally administered and outside city limits.
  • Relative support: with-restrictions Comprehensive plan explicitly endorses ADUs for elderly family-member housing; family-relation restrictions will be eliminated by SB 531 effective July 1, 2027.

Contacts

DepartmentCity of Manassas Community Development (Planning & Development)

Utilities

  • Water: City of Manassas Utility Services (operates own water plant on Lake Manassas) · 32d connect · $5,800
  • Sewer: City of Manassas Utility Services (UOSA regional treatment) · 32d connect · $6,800
  • Electric: City of Manassas Electric Utility (municipal utility distinct from surrounding Dominion territory) · 21d connect · $1,800
  • Gas: Washington Gas · 42d connect · $2,700

Property values & taxes

Median value$458,000
Median tax$4,763/yr
Effective rate1.0%

Construction timeline

Detached build24 weeks
Conversion14 weeks
Contractor lead3 months

Realistic total: best 8mo · typical 12mo · worst 18mo

Modular pathway inspectors are occasional with modular

Old Town Manassas streets are narrow with overhead wires; modular delivery feasible in newer subdivisions but constrained in historic district.

Financing

Fannie Mae ADUeligible

State ADU loans:

Insurance impact

Annual premium delta$330
Landlord policyrecommended
Umbrella threshold$1M umbrella recommended when renting

HOA prevalence & preemption

State HOA preemptionno

Manassas has a mixed housing stock: Old Town single-family (mostly non-HOA but in Historic Overlay) plus newer suburban subdivisions with HOA covenants. Virginia POAA does not preempt HOA ADU bans.

Regulatory overlays (1)

  • historic-district
    Manassas Historic Overlay District covers Old Town Manassas (Center Street, Battle Street, West Street area). Properties in the Historic Overlay require Architectural Review Board approval before building permits issue.
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone4A
Heating degree days4,250
Cooling degree days1,500
Design low / high14°F / 92°F
Frost depth24"
Design snow load25 psf
Wind design speed115 mph
Seismic design cat.B
Annual rainfall42"
Wildfire exposurelow
Energy codeIECC
Version / adopted2018 / 2021

Building code

Base codeIRC
Version year2,021
Adopted2024-01-18
Fire sprinklernone
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-49 min
Wall R-valueR-20 min

Amendments:

  • Amendment
  • Amendment
  • Amendment

Contractor market (aggregate)

Licensed residential GCs1,480
ADU-specialist GCs26
Unionized share14%
Laborer median wage$23/hr
Typical GC markup18%

Known issues (3)

  • policy-review — ADU applicants today face case-by-case zoning interpretation. The nonconforming-structure ordinance currently blocks conversion of existing accessory structures; an amendment exempting accessory-to-ADU conversion is in the draft.
  • other — Historic-overlay properties face higher cost and longer timeline than baseline Manassas ADU projects.
  • other — Electric service planning for ADU projects must use City of Manassas Electric Utility, not Dominion.
County: no attribution (synthetic bucket)

No county

This city sits in the state's "no county" bucket — its ADU rules derive directly from state law and city ordinance without a county intermediary. No county-level sections apply.

Virginia state — ADU law and programs

State ADU law

Virginia has NOT enacted a statewide ADU preemption law. Virginia is a Dillon Rule state — localities possess only those powers expressly granted by the General Assembly — and the statutes granting zoning authority (Va. Code § 15.2-2280 et seq.) leave ADU regulation to local ordinances. ADU permission, setbacks, parking, size, and owner-occupancy rules therefore vary by county, independent city, and town. Virginia is unique in that it has 38 independent cities that function as counties (neither in nor subordinate to the surrounding county), meaning 'the county' for any given Virginia property may be an independent city rather than a true county. Several ADU preemption bills have been introduced in recent General Assembly sessions (2022 through 2025) without enactment; none have advanced past committee as of the Assembly's 2026 regular session adjournment.

State financing programs

Virginia does not operate an ADU-specific statewide loan, grant, or forgivable-loan program. Virginia Housing (formerly the Virginia Housing Development Authority, VHDA — rebranded 2020) administers general first-time-homebuyer, down-payment-assistance (DPA), mortgage-credit-certificate, and rehabilitation products that can be applied to ADU-adjacent purchases or improvements when eligibility criteria are met, but none target ADU construction as a distinct product. The Virginia Department of Housing and Community Development (DHCD) administers federal HOME and CDBG pass-through funds that local jurisdictions can direct toward ADU-adjacent rehab, but there is no state-level ADU-dedicated line item. Federally available products (FHA 203(k), Fannie Mae HomeReady and HomeStyle Renovation, Freddie Mac CHOICERenovation) remain the primary ADU financing path for Virginia homeowners.

State housing programs

Virginia does not run a state-level pre-approved-ADU-plan catalog, statewide impact-fee-waiver statute for ADUs, or streamlined-review mandate. State-level programs that touch ADU-adjacent policy are coordinated primarily through the Department of Housing and Community Development (DHCD) and Virginia Housing, and act by funding or assisting local jurisdictions rather than by preemption. Local ADU activity — Arlington County's Accessory Dwellings program (detached ADUs permitted since 2008, liberalized 2020), Alexandria's accessory-dwelling ordinance, Fairfax County's accessory-living-unit program, and Charlottesville's 2021 zoning-code changes — is authorized under the localities' Va. Code § 15.2-2280 zoning authority, not by state mandate.

  • DHCD Community Development Block Grant (CDBG) Program — Federal CDBG funds administered by DHCD to eligible non-entitlement Virginia localities for community-revitalization, housing-rehab, and infrastructure projects. Not ADU-specific. Participating localities can direct CDBG funds toward housing-rehab projects where local policy supports ADUs.
  • DHCD HOME Investment Partnerships Program — Federal HOME funds administered by DHCD to Virginia participating jurisdictions and non-profits for affordable-housing acquisition, rehab, and new construction. Not ADU-specific; can be directed to ADU-adjacent rehab at local discretion.
  • Virginia Housing Commission — Permanent advisory commission of the General Assembly that studies housing-policy questions and recommends legislation. Has periodically studied ADU preemption and missing-middle housing without recommending statewide enactment as of 2026-04-21.
  • Local ADU ordinances under Va. Code § 15.2-2280 authority — Not a state program — listed here because Virginia ADU policy is executed entirely at the locality level under the § 15.2-2280 zoning grant. A homeowner seeking to build an ADU consults the zoning ordinance of the specific county, city, or town where the parcel is located.
Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Code

  • 20108

Post Office

  • 8801 Sudley Rd, 20110
  • 9108 Church St, 20110

Locale Names

  • Downtown Manassas