Mapleville
ADU Pass helps homeowners in Mapleville, Providence County, Rhode Island navigate the permit paperwork for building an accessory dwelling unit. This area covers 1 ZIP code.
Map
ADU details
ADU legality: allowed
RIGL 45-24-73 preempts owner-occupancy and special-use-permit gating. Mapleville's binding constraint is rural infrastructure: no public sewer, no PWSB or municipal water service in the village; private well + RIDEM ISDS septic gate ADU bedroom-add capacity.
Cost scenarios
| Scenario | Sq ft | Permit | Build | Total |
|---|---|---|---|---|
| minimum | 150 | $2,500 | $43,500 | $46,000 |
| 600 | 600 | $2,500 | $174,000 | $176,500 |
| midpoint | 675 | $2,500 | $195,750 | $198,250 |
| maximum | 1,200 | $2,500 | $348,000 | $350,500 |
Fee breakdown (as of 2026-04)
Permitting process
- Confirm Mapleville parcel under Burrillville Chapter 30 (~3d)
Mapleville is one of several villages within the rural Town of Burrillville (NW Rhode Island, abutting Connecticut and Massachusetts). All zoning, permits, and inspections flow through Burrillville. Pull parcel card from Burrillville Tax Assessor and confirm rural-residential zoning under updated October 2022 maps. - Verify septic capacity - private wells and RIDEM ISDS are the rule (~30d)
Mapleville has no public sewer and no public water; nearly all parcels are on private well + onsite ISDS septic. Adding ADU bedrooms triggers RIDEM ISDS application under Title 250-RICR-150-10-6 (OWTS rules). A licensed designer must perform soil percolation tests and design a system sized for total bedrooms (existing primary + ADU). - Submit RIDEM ISDS application directly to state DEM (~45d)
ISDS application filed via RIDEM Office of Water Resources (235 Promenade St, Providence; 401-222-4700). Fee typically $300-$800 depending on system size; review timeline 30-60 days separate from local permit clock. - Submit building permit via RI statewide e-permitting (permits.ri.gov) (~1d)
Select 'Town of Burrillville' on the portal. Burrillville onboarded 2023-07-31 (most recent of the four NW RI towns). Upload IRC plans, site plan with well and septic locations, and stamped RIDEM ISDS approval. - Burrillville Building Department plan review (Harrisville Main Street) (~14d)
Burrillville Building & Zoning Department, 144 Harrisville Main Street, Harrisville RI 02830, 401-568-4300 ext 128. Hours M-W 8:30-4:30, Th 8:30-7:00 (extended evening uniquely useful), F 8:30-12:30. IRC 2018 with RI amendments. - Stormwater management review for Branch River / Clear River watershed (~10d)
Mapleville drains to the Clear River and Branch River, ultimately feeding the Blackstone. Burrillville applies stricter stormwater controls in the Branch River watershed than other parts of town to protect downstream water quality. New impervious surface may trigger an erosion-control plan. - Pay state-formula fees plus Burrillville local surcharges (~1d)
Fees per RI 510-RICR-00-00-21 (~$19-23 per $1,000 valuation). RIDEM ISDS fee paid separately to state. Harrisville Fire District / Pascoag Fire District (whichever covers parcel) coordinates fire-marshal review. - Construction inspections by Burrillville Building Department
Standard sequence (footing, foundation, framing, MEP rough, insulation, final). Septic 'as-built' inspection coordinated with RIDEM ISDS designer. Fire-related inspections by the parcel's fire district (Harrisville FD or Pascoag FD). - Certificate of Occupancy from Burrillville plus RIDEM septic as-built (~7d)
Final CO from Burrillville Building Official requires the RIDEM ISDS as-built letter on file. Both gate occupancy.
Viability (permitted uses)
- Long-term rental: yes Long-term rental of ADU explicitly permitted; RIGL 45-24-73 preempts owner-occupancy requirements.
- Short-term rental: with-restrictions STR rules vary by city. Mapleville STR follows Burrillville rules; rural-tourism demand is modest (Buck Hill / Pulaski state forest are nearby attractions).
- Office rental: with-restrictions Detached office rental requires home occupation permit or rezoning.
- Home office: yes Home occupation permitted with restrictions on signage and customer traffic.
- Studio / workshop: yes Personal artist studio is a permitted accessory use.
- Agriculture: yes Burrillville's rural character makes agricultural accessory uses commonplace; livestock generally permitted in rural-residential zones with parcel-size minimums.
- Relative support: yes Family-occupancy ADU explicitly permitted; common rural multigenerational pattern in Mapleville.
Contacts
Staff: Burrillville Building & Zoning Department (Permits and inspections (Th extended hours to 7:00 PM)), Burrillville Town Clerk (Permit recording / records of decision) townclerk@burrillville.org, RIDEM Office of Water Resources (ISDS septic review (gates Mapleville ADU permits))
Utilities
- Water: Private well (no PWSB or municipal water in Mapleville village) · 21d connect · $8,500
- Sewer: Private septic / RIDEM ISDS jurisdiction (no public sewer in Mapleville) · 60d connect · $18,000
- Electric: Rhode Island Energy (formerly National Grid RI); Pascoag Utility District serves nearby Pascoag village but NOT Mapleville · 14d connect · $1,800
- Gas: Rhode Island Energy (gas) where service exists; many Mapleville parcels use propane or oil · 21d connect · $1,500
Property values & taxes
Construction timeline
Realistic total: best 8mo · typical 13mo · worst 19mo
Modular pathway inspectors are occasional with modular
Financing
State ADU loans:
Insurance impact
HOA prevalence & preemption
RIGL 45-24-73 voids conflicting HOA ADU restrictions. Mapleville's rural large-lot character means almost no HOA presence; closest comparable design control is Burrillville's general subdivision-rules package, not covenants.
Regulatory overlays (2)
- groundwater-protection
Mapleville drains to Clear River / Branch River watershed feeding the Blackstone. RIDEM ISDS rules and state groundwater-protection requirements apply with stricter setbacks than urban areas. - rural-conservation
Burrillville is one of RI's most rural towns; large-lot rural-residential zoning predominates and conservation overlays may apply on parcels adjacent to Buck Hill Management Area or Pulaski Memorial State Forest.
Technical envelope (climate & building code)
Climate & energy code
Building code
Amendments:
- Amendment
- Amendment
Legal history (timeline)
Current ordinance: Burrillville Code of Ordinances Chapter 30 (Zoning), as conformed to RIGL 45-24-73, adopted 2022-10-01, last amended 2024-09-01
- 2022-10-01 — Burrillville zoning district maps adopted/updated October 2022 (city-ordinance)
Town adopted updated zoning district maps including the rural residential overlays governing Mapleville and other Burrillville villages.
Effect: Established the current map basis on which Mapleville parcel ADU eligibility is checked. - 2023-07-31 — Burrillville onboards RI Statewide E-Permitting Portal (permits.ri.gov) - 2023-07-31 (city-ordinance)
Burrillville was the most recent of the four NW RI municipalities (Lincoln, North Smithfield, Glocester, Burrillville) to migrate from paper to the RIBCC statewide e-permitting platform.
Effect: All Mapleville ADU permits now flow through permits.ri.gov; pre-July-2023 permit records remain on the legacy system reachable at 401-568-4300 ext 128. - 2024-06-25 — RI H 7062 / S 2998 enacted (P.L. 2024 ch. 284-287) - statewide ADU preemption (state-law)
Made ADUs a permitted use in all residential zones statewide; established minimum size floors; voided HOA ADU prohibitions.
Effect: Burrillville Chapter 30 conformed (Mapleville parcels gain by-right ADU status subject to RIDEM ISDS septic capacity).
Known issues (1)
- issue —
Rhode Island state — ADU law and programs
State ADU law
Rhode Island enacted statewide ADU preemption in 2024 through H 7062 (chief sponsor Rep. June Speakman and colleagues; co-sponsored in the Senate as S 2710), which amended the Zoning Enabling Act (Title 45, Chapter 24). Municipalities must permit ADUs by-right on any lot containing a single-family dwelling, subject only to uniform minimum standards set by the statute. One of the most ADU-friendly state statutes in the country as of 2025.
- R.I.G.L. § 45-24-73 — Design standards required for accessory dwelling units; Consistent statewide treatment of accessory dwelling units required — Core ADU standards added by H 7062 (2024). Requires municipalities to permit ADUs by-right. Caps 1-bedroom and studio ADUs at 900 sqft or 60% of the principal dwelling's floor area, whichever is less. Caps 2-bedroom ADUs at 1,200 sqft or 60%, whichever is less. Prohibits owner-occupancy requirements. Caps additional parking at 1 off-street space per bedroom. Prohibits ADU-specific impact fees. Voids HOA, condominium, and similar private-covenant restrictions that conflict with the statute as against public policy.
- H 7062 (2024 RI General Assembly) — An Act Relating to Housing — Accessory Dwelling Units — The enacting bill. Also cited by municipalities adopting conforming ordinances (Providence 2024 Chapter 3584, East Providence 2024 ADU Ordinance, South Kingstown 2024-07-12 regulations).
State HOA preemption
R.I.G.L. § 45-24-73 explicitly voids homeowners' association, condominium association, or similar private-covenant restrictions on ADUs when those restrictions conflict with the statute's ADU minimums. The preemption is framed as a public-policy void, meaning the offending covenant is unenforceable rather than simply regulated. Pre-existing ADU-friendly covenants remain valid (the statute only void conflicting restrictions). Applies to all common-interest communities governed by the Rhode Island Condominium Act (R.I.G.L. Title 34, Chapter 36) and Rhode Island Condominium Ownership Act (Title 34, Chapter 36.1), as well as HOAs in planned-community subdivisions.
- R.I.G.L. § 45-24-73 (HOA preemption clause added by H 7062 (2024)) — Provides that private covenant restrictions imposed by condominium associations, homeowners' associations, or similar residential property governing bodies that conflict with the ADU provisions are void as against public policy. Drafted broadly — covers declarations, bylaws, rules and regulations, and recorded covenants.
State financing programs
RIHousing, the state's housing finance agency, operates an ADU financing program built around the FHA 203(k) loan product. Covers attached and interior ADUs for both purchase and refinance. Detached ADUs are NOT eligible. Requires mandatory homebuyer education, use of an FHA-approved 203(k) consultant, and a RI licensed and insured contractor. No state-specific grant program for ADUs is in effect as of 2026-04-21; the federal 203(k) rails are the production vehicle.
State housing programs
Rhode Island does not currently operate a single statewide pre-approved-ADU-plan catalog (as California's CalHFA and Washington's Commerce plan libraries). Implementation of the 2024 ADU law is happening municipality-by-municipality, with the Executive Office of Housing (EOH) coordinating technical assistance. Providence published a citywide ADU Guide (February 2025) as the leading model; East Providence adopted a conforming ordinance in 2024; South Kingstown published regulations in 2024. RIHousing runs the ADU financing side (see stateFinancing).
Federal (United States) — ADU-relevant rules and programs
Federal ADU law
The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.
Federal financing programs
Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.
Federal tax credits
There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.
Federal housing programs
HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.