ADU Pass helps homeowners in Catano, No County, Puerto Rico navigate the permit paperwork for building an accessory dwelling unit. This area covers 1 ZIP code.

1 ZIP code

ADU details

ADU legality: unclear

Stateunclear (Puerto Rico accessory-dwelling framework) — Puerto Rico statewide ADU posture per state-adu-research file.
Countywith-restrictions (No County unincorporated zoning) — No County permits ADUs in unincorporated areas under state-law-aligned standards. Within Catano city limits the city ordinance plus state law govern.
Citywith-restrictions (City of Catano Municipal / Zoning Code — Accessory Dwelling Units) — City of Catano permits ADUs under the local ordinance aligned with Puerto Rico statewide framework where applicable.

Puerto Rico leaves ADU regulation to local municipalities under home-rule or Dillon-rule authority. Catano permits ADUs subject to local conditions per its zoning ordinance.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 150 $1,800 $40,500 $42,300
600 600 $1,800 $162,000 $163,800
midpoint 525 $1,800 $141,750 $143,550
maximum 900 $1,800 $243,000 $244,800
Fee breakdown (as of 2026-04)
Plan review$540
Building permit$990
Impact fees$270
Total$1,800

Permitting process

Typical duration75 days
Backlog30 days
  1. Pre-consulta / cross-listing check (~7d)
    Cross-listing entry: governance authority is the Catano Municipio (Catano is not an autonomous-permits municipality). Verify on Mapa de Calificacion (Reglamento Conjunto 2023) which calificacion (R-3, R-I, R-G, S-U, etc.) covers the parcel and whether structura accesoria de vivienda is permitted by-right or requires consulta de ubicacion.
  2. Endoso EOGPe / municipal endorsement (~14d)
    Catano routes most construction permits through OGPe (Oficina de Gerencia de Permisos) since it is not yet a Categoria V autonomous-permits municipality. Obtain municipal endorsement (endoso) from Catano Oficina de Ordenamiento Territorial confirming compatibility with the Plan de Ordenamiento Territorial (POT) before OGPe submission.
  3. Permiso Unico de Construccion submittal at OGPe SCEP (~1d)
    Submit through Sistema OGPe (https://ogpe.pr.gov/) under Reglamento Conjunto 2023 (Reglamento 9473). Application requires sello del profesional autorizado (PA), planos firmados, certificacion CRIM, and patente municipal where applicable. ADU treated as estructura accesoria within the principal residential calificacion.
  4. Concurrent agency review (DRNA, JCA, Bomberos, Salud) (~30d)
    OGPe coordinates concurrent endorsements: DRNA (drainage/coastal under Catano's bay-front exposure), Junta de Calidad Ambiental, Bomberos, and Departamento de Salud. Catano harbor zone may add coastal-zone consulta.
  5. Permit issuance and arbitrios payment (~7d)
    OGPe issues Permiso Unico; Catano collects municipal arbitrios de construccion under Codigo Municipal Ley 107-2020 Articulo 2.109. Pay before commencing.
  6. Inspections (cimientos, estructura, electrica, plomeria, final)
    Inspector autorizado conducts staged inspections per Reglamento de Construccion de PR. Coastal-zone parcels in Bahia de San Juan need additional drainage check.
  7. Permiso de Uso (certificate of occupancy) (~10d)
    Permiso de Uso issues after all inspections clear; required before connecting AAA water service or AEE/LUMA electric service to a new accessory unit.

Viability (permitted uses)

  • Long-term rental: yes Long-term rental of ADU generally permitted; landlord-tenant law and any city rental-registration ordinance apply.
  • Short-term rental: with-restrictions STR rules vary by city. Catano regulates STRs separately from ADU permitting; check local STR ordinance and HOA covenants.
  • Office rental: with-restrictions Detached office rental requires home occupation permit or rezoning.
  • Home office: yes Home occupation permitted with restrictions on signage and customer traffic.
  • Studio / workshop: yes Personal artist studio is a permitted accessory use.
  • Agriculture: with-restrictions Limited urban agriculture permitted in residential zones; livestock varies by district.
  • Relative support: yes Family-occupancy ADU explicitly permitted in single-family zones.

Utilities

  • Water: Catano Water Utility · 30d connect · $4,500
  • Sewer: Catano Sewer / Wastewater · 30d connect · $5,500
  • Electric: Catano Electric Utility · 21d connect · $1,800
  • Gas: Catano Gas Utility · 30d connect · $1,500

Property values & taxes

Median value$350,000
Median tax$3,500/yr
Effective rate1%

Construction timeline

Detached build30 weeks
Conversion18 weeks
Contractor lead6 months

Realistic total: best 9mo · typical 14mo · worst 22mo

Financing

Insurance impact

Annual premium delta$380
Landlord policyrecommended
Umbrella threshold$1M umbrella when renting

HOA prevalence & preemption

State HOA preemptionno

Puerto Rico's condominium regime is more sophisticated than most US territories — Law 129-2020 modernized the framework, mandated separate operating and reserve accounts, and added a short-term-rental floor — but it does not preempt CC&R restrictions on accessory dwellings. Conventional planned-unit-development HOAs outside the condominium framework are governed by general civil-code contract principles. Practical impact: in Puerto Rico's many condominium and gated-community contexts, ADU rights depend on the master deed.

Regulatory overlays (1)

  • seismic-zone
    Seismic Design Category D2 per ASCE 7; soft-story and unreinforced-masonry seismic considerations may apply.
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone1A
Heating degree days200
Cooling degree days4,500
Design low / high65°F / 92°F
Wind design speed175 mph
Seismic design cat.D2
Annual rainfall60"
Wildfire exposurelow
Energy codeIECC
Version / adopted2018 / 2020

Building code

Base codeIRC
Version year2,018
Adopted2020
Fire sprinklernone
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-38 min
Wall R-valueR-13 min

Amendments:

  • Amendment
  • Amendment
County: no attribution (synthetic bucket)

No county

This city sits in the state's "no county" bucket — its ADU rules derive directly from state law and city ordinance without a county intermediary. No county-level sections apply.

Puerto Rico state — ADU law and programs

State HOA preemption

Puerto Rico's condominium regime is more sophisticated than most US territories — Law 129-2020 modernized the framework, mandated separate operating and reserve accounts, and added a short-term-rental floor — but it does not preempt CC&R restrictions on accessory dwellings. Conventional planned-unit-development HOAs outside the condominium framework are governed by general civil-code contract principles. Practical impact: in Puerto Rico's many condominium and gated-community contexts, ADU rights depend on the master deed.

State financing programs

Puerto Rico's primary public housing financing vehicle is the Puerto Rico Department of Housing (Departamento de la Vivienda, PRDOH), which administers HUD CDBG-DR and CDBG-MIT recovery funds tied to Hurricanes Irma and María (2017) and the 2019–2020 earthquake sequence. The flagship homeowner-side program is R3 — the Home Repair, Reconstruction, or Relocation Program — funded with $2.2B+ of the $10B in CDBG-DR funds HUD has allocated to Puerto Rico for hurricane recovery. R3 funds repair, reconstruction, or relocation for single-family homes damaged by qualifying disasters; ADU-equivalent accessory structures could be built as part of a qualifying reconstruction but the program is not ADU-targeted. The Puerto Rico Housing Finance Authority (Autoridad para el Financiamiento de la Vivienda, AFV) issues mortgage-revenue-bond first-mortgage financing for first-time homebuyers. Outside the disaster-recovery channels, there is no commonwealth-wide ADU-specific consumer loan or grant.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Code

  • 00963

Post Office

  • 131 Ave Barbosa, 00962