ADU Pass helps homeowners in Santa Ana, Orange County, California navigate the permit paperwork for building an accessory dwelling unit. This area covers 6 ZIP codes.

6 ZIP codes

ADU details

ADU legality: allowed

Stateallowed (California ADU Law (Gov Code §§ 65852.2 / 65852.22) — statewide ministerial preemption) — California preempts most local ADU restrictions. 60-day ministerial approval, voids local owner-occupancy requirements (AB 976, eff. 2024), HOA preemption (AB 670/3182), impact-fee exemption for ADUs <750 sqft (SB 13). SB 1211 (eff. 2025-01-01) further expanded multi-family ADU pathways.
Countyallowed (Orange County Zoning Code Title 7 — applies in unincorporated areas only) — Orange County governs ADUs in unincorporated areas only; inside Santa Ana the Santa Ana Municipal Code Chapter 41 plus state ADU law govern. Santa Ana is the OC seat (county government, courts, and Civic Center are inside city limits).
Cityallowed (Santa Ana Municipal Code Chapter 41 (Zoning) — Article II §§ 41-194 through 41-194.3 (Accessory Dwelling Units and Junior Accessory Dwelling Units)) — ADUs permitted in residential and mixed-use zones per SAMC §§ 41-194 et seq. Detached ADU max 1,000 sqft; attached up to 1,000 sqft or 50% of primary floor area (whichever is less, with 800-sqft floor). Detached height 20 ft / 2 stories. 4-ft side/rear setback. Ordinance was updated in 2025 to comply with SB 1211 (multi-family ADU pathways). City offers 6 over-the-counter Pre-Approved ADU Plans (1-day OTC approval possible).

ADUs are permitted citywide. Santa Ana has actively embraced ADU policy with a 6-plan Pre-Approved Plans Program enabling same-day over-the-counter approval and a 20-ft / 2-story detached height allowance that exceeds the state baseline. Constraints to verify per parcel: SNA Airport AICUZ (south Santa Ana / west of I-405) and Downtown Santa Ana Historic District design review for Logan / French Park / Floral Park overlays.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 150 $2,200 $84,000 $86,200
600 600 $7,800 $300,000 $307,800
midpoint 675 $8,800 $337,500 $346,300
1000 1,000 $11,500 $480,000 $491,500
Fee breakdown (as of 2026-04)
Plan review$1,400
Building permit$2,900
School fees$2,900
Utility connection$3,200
Total$9,750

Permitting process

Typical duration45 days
Backlog14 days

Viability (permitted uses)

  • Long-term rental: yes Long-term rental (30+ days) explicitly permitted. AB 976 voids any Santa Ana requirement for owner-occupancy as a condition of ADU permitting. Note: Santa Ana is a tenant-protection city (Rent Stabilization Ordinance applies to qualifying multi-family housing); ADU rental terms should be reviewed against city tenant-protection rules.
  • Short-term rental: no Santa Ana prohibits short-term vacation rentals (under 30 days) per SAMC. Minimum 30-day rental term required. ADU cannot be operated as Airbnb/VRBO.
  • Office rental: with-restrictions Detached office rental requires home occupation permit; ADU is residentially defined under Chapter 41.
  • Home office: yes Home occupation by owner/resident permitted with restrictions on signage, customer traffic, and employees per Santa Ana Municipal Code.
  • Studio / workshop: yes Personal artist studio permitted as accessory residential use; Downtown Santa Ana Artists Village area has a strong creative community.
  • Agriculture: no Santa Ana is densely urbanized (one of the densest cities in California); agricultural uses not permitted in residential zones.
  • Relative support: yes Family occupancy permitted; multigenerational housing use is common in Santa Ana given the city's high household-size demographics.

Incentives

Pre-approved plans Pre-approved plans

Contacts

DepartmentCity of Santa Ana Planning and Building Agency

Staff: ADU Information Line (Planning Division — Current Planning) (ADU intake / general ADU questions), Planning Division (Advance Planning, Current Planning, Urban Design, Historic Preservation), Building Safety Division (Permit Services, Plan Check, Inspection Services), Permits Counter (One-Stop) (OTC Pre-Approved Plan submittals; permit issuance)

Utilities

  • Water: City of Santa Ana Water Resources Division (municipal — Public Works Agency) · 14d connect · $3,000
  • Sewer: City of Santa Ana Sanitary Sewer (municipal); regional treatment by Orange County Sanitation District (OCSD) · 14d connect · $3,800
  • Electric: Southern California Edison (SCE) — call 800-655-4555 to obtain MSR# before electrical permit application · 21d connect · $2,000
  • Gas: Southern California Gas Company (SoCalGas) · 28d connect · $1,600

Property values & taxes

Median value$760,000
Median tax$8,600/yr
Effective rate1.1%

Market rent by ADU size

Sq ftRent
400$1,850/mo
600$2,350/mo
800$2,750/mo
1,000$3,100/mo

Construction timeline

Detached build22 weeks
Conversion11 weeks
Contractor lead4 months

Realistic total: best 7mo · typical 11mo · worst 17mo

Modular pathway inspectors are occasional with modular

Financing

Fannie Mae ADUeligible

State ADU loans:

Insurance impact

Annual premium delta$480
Landlord policyrecommended
Umbrella threshold$1M umbrella when renting

HOA prevalence & preemption

State HOA preemptionyes

Santa Ana has very low HOA coverage compared to master-planned OC cities. The city's older urban-grid neighborhoods (Logan, French Park, Floral Park, Washington Square, Wilshire Square, Riverview West) are pre-CC&R and historically free of homeowner associations. Some newer infill condo communities and townhome developments carry HOA governance, but the broad single-family stock is unaffiliated. California AB 670 / AB 3182 void HOA covenants prohibiting ADUs on single-family lots; rarely a friction point in Santa Ana given low HOA penetration.

Regulatory overlays (3)

  • historic-district
    Multiple Santa Ana historic districts trigger design review for visible exterior changes: Downtown Santa Ana Historic District, Logan Historic District, French Park Historic District, Floral Park, and Washington Square. ADUs in these districts are subject to Historic Preservation review by Planning Division Urban Design / Historic Preservation team.
  • airport-noise-zone
    Portions of Santa Ana (south of I-405 / east of SR-55) fall under John Wayne Airport (SNA) AICUZ noise contours; sound-attenuation glazing/walls may be required. Airport Land Use Commission (ALUC) review may apply.
  • flood-zone
    Santa Ana River corridor and historic flood-prone neighborhoods carry FEMA flood-zone designation (AE/A); flood-elevation certification required for ADUs in mapped floodplain. The 1938 Los Angeles flood reshaped southwest Santa Ana drainage.
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone3B
Heating degree days1,380
Cooling degree days1,100
Design low / high39°F / 88°F
Wind design speed95 mph
Seismic design cat.D2
Annual rainfall13"
Wildfire exposurelow-moderate
Energy codeTitle 24
Version / adopted2025 / 2026
Solar requiredyes
EV-ready requiredyes

Building code

Base codeCRC
Version year2,025
Adopted2026
Fire sprinkleruniversal
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-38 min
Wall R-valueR-13 min

Amendments:

  • Amendment
  • Amendment

Contractor market (aggregate)

Licensed residential GCs178
ADU-specialist GCs24
Median GC size (employees)7
Unionized share0.1%
Laborer median wage$27/hr
Typical GC markup17%

Known issues (2)

  • policy-review — Pre-Approved Plans are still on 2022 CBC; 2025 CBC updates pending publication. Custom designs already use 2025 CBC. Watch for plan-update release.
  • other — Multiple historic districts (Logan, French Park, Floral Park, Washington Square, Downtown) layer design review on ADUs in those neighborhoods. Generic Pre-Approved Plans will likely fail historic-district review without exterior modifications matching district character.
Orange County — county ADU rules and overlays

County ADU ordinance

California state — ADU law and programs

State ADU law

California has the most aggressive statewide ADU preemption regime in the US, built from ~15 bills passed 2019-2025 and enforced by the Department of Housing and Community Development (HCD). The 2026 HCD ADU Handbook addendum (in effect with the 2025 Title 24 code cycle) is the operative state-level reference. The regime does four things at once: (1) preempts local zoning that would ban or unreasonably restrict ADUs; (2) imposes by-right ministerial approval with short statutory deadlines; (3) caps fees and utility-connection charges; and (4) empowers HCD to void non-compliant local ordinances.

State HOA preemption

California has the strongest statewide HOA-preemption regime in the US for accessory dwelling units, built from two bills: AB 670 (2019) voided ADU-prohibiting covenants on single-family residential lots, and AB 3182 (2020) extended and codified the preemption into the Davis-Stirling Common Interest Development Act (Civil Code §§ 4740 / 4741). The combination prohibits common-interest communities from banning ADUs, restricting rentals below 25% of separate interests, or treating ADUs as separate HOA interests. Limits remain: HOAs retain authority over reasonable design standards and statutory height limits, and the 2026 Carlsbad case (CalMatters coverage) established that an HOA's documented design-standards regime can effectively delay or constrain ADU approval short of outright prohibition.

State financing programs

California's flagship state-level ADU financing program — the CalHFA ADU Grant Program — is paused and has not been refunded since the original $100 million allocation was fully deployed 2023-12-28. The program provided up to $40,000 per qualifying homeowner for pre-construction and non-recurring closing costs and financed approximately 2,500 ADUs in two rounds. As of 2026-04, no new funding round has been announced in the state budget. CalHFA continues to publish anti-scam warnings because bad actors actively solicit homeowners claiming access to grant funds that no longer exist. State-level financing activity has shifted to local pilot programs (San Francisco, San Jose, Los Angeles, San Diego) and private financing products (Fannie Mae ADU mortgage, HELOC, construction-to-permanent).

State housing programs

California's state-level ADU programs are concentrated at HCD (technical guidance, ordinance review, enforcement) and the paused CalHFA grant pipeline (covered under stateFinancing). The state does not operate a central pre-approved ADU plan library — instead, AB 1332 (2024) created a preemption framework for local pre-approved plans with a 30-day ministerial-approval deadline, and major cities (Los Angeles, San Diego, San Jose, Sacramento, Berkeley) have rolled out their own plan catalogs. The California YIMBY coalition and other housing-policy organizations play an influential role in bill drafting; they are not state agencies but effectively drive much of the ADU legislative agenda. The Title 24 code cycle (now 2025, in effect for 2026 permits) is the authoritative building-code baseline.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Codes

  • 92701
  • 92703
  • 92704
  • 92705
  • 92706
  • 92707

Post Office

  • 1415 S Main St, 92707
  • 1517 S Greenville St, 92704
  • 1609 N King St, 92706
  • 1620 W 1st St, 92703
  • 2201 N Grand Ave, 92711

Locale Names