Anaheim

Orange County portion

ADU Pass helps homeowners in Anaheim, Orange County, California navigate the permit paperwork for building an accessory dwelling unit. This area covers 7 ZIP codes.

7 ZIP codes

ADU details

ADU legality: allowed

Stateallowed (Cal. Gov. Code §§ 65852.2 / 65852.22 (statewide ADU/JADU framework, AB 68/AB 681/SB 13/AB 670/AB 3182/AB 976/SB 897/AB 2221)) — California ADU statutes preempt local rules: ministerial 60-day approval, 4-foot side/rear setback floor, 16-foot minimum height for detached, fee waivers under 750 sqft, no owner-occupancy as of 2024-01-01.
Countyallowed (Orange County Zoning Code Title 7 (unincorporated only)) — Within Anaheim city limits the City of Anaheim Building & Planning governs. The county's ADU rules apply only to unincorporated parcels (not Anaheim).
Cityallowed (Anaheim Municipal Code Title 18, Section 18.38.015 — Accessory Dwelling Units and Junior Accessory Dwelling Units) — Section 18.38.015 codifies the local ADU framework conforming to state law. Adopted as Ordinance No. 6483 in 2020; amended in January 2025 and January 2026 for SB 897 / AB 2221 alignment. Note: §18.06.160 (Planning Commission interpretation authority) is sometimes cited but is NOT the ADU section — the ADU section is 18.38.015.

ADUs allowed by-right in single-family and most multi-family zones. Anaheim runs an ADU Express expedited program (1-3 day approval for detached new construction using city pre-approved plans). Detached ADU height up to 16 ft (or 18-25 ft if attached to primary or near transit), parking exempt within 1/2 mile of public transit.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 150 $5,500 $75,000 $80,500
600 600 $7,800 $300,000 $307,800
midpoint 675 $8,400 $337,500 $345,900
1000 1,000 $16,800 $490,000 $506,800
maximum 1,200 $19,500 $576,000 $595,500
Fee breakdown (as of 2026-04)
Plan review$1,100
Building permit$4,200
Total$5,550

Permitting process

Typical duration60 days
Backlog14 days

Viability (permitted uses)

  • Long-term rental: yes Long-term rental (30+ days) explicitly permitted with no owner-occupancy requirement (AB 976, effective 2024-01-01).
  • Short-term rental: with-restrictions Anaheim has a long history of restricting STRs (especially given Disneyland tourism dynamics). Short-Term Rental (STR) of an ADU requires a separate Short-Term Rental Permit with limited zoning eligibility; many residential zones do not allow STRs at all. Owners must remit Transient Occupancy Tax.
  • Office rental: with-restrictions Standalone commercial office rental of an ADU is not a permitted ADU use. Home occupations within an owner-occupied ADU are allowed.
  • Home office: yes Home occupation permitted with traffic / employee / signage limits per Anaheim Municipal Code.
  • Studio / workshop: yes Personal artist studio / workshop is a permitted accessory residential use.
  • Agriculture: with-restrictions Anaheim is heavily urbanized and zoning permits only minimal urban agriculture in residential districts; livestock is generally prohibited in single-family zones.
  • Relative support: yes Family-occupancy ADU explicitly permitted; multigenerational housing is one of the most common Anaheim ADU use cases.

Incentives

Contacts

DepartmentCity of Anaheim Planning & Building Department
HoursBuilding Services: Mon/Tue/Wed/Fri 8am-4pm, Thu 9am-4pm. Planning Services: Mon-Fri 8am-5pm.

Contractor directory (6)

Scope: city, 12 mi radius.

General Contractor (6)
  • Anaheim ADU Construction ADU specialist
    website
  • John Christopher Construction ADU specialist
    website
  • Kol & Co. ADU specialist
    website
  • Gettler Construction Inc ADU specialist
    website
  • Horizon Remodeling Inc ADU specialist
    website
  • Orange County Construction Architect ADU specialist
    website

Utilities

  • Water: Anaheim Public Utilities (APU) — municipal water utility serving all of Anaheim · 21d connect · $4,200
    APU is a municipal utility — Anaheim is unusual in OC for being its own water and electric provider rather than relying on Cal Water / Golden State Water / SoCal Edison. Bimonthly billing for residential customers.
  • Sewer: Orange County Sanitation District (OC San / OCSD) for treatment; City of Anaheim collection system · 30d connect · $4,800
    OC San operates Plant No. 1 in Fountain Valley, which receives Anaheim wastewater. OC San charges sewer fees separately on the property tax bill (annual sewer service charge) rather than per-connection. ADU connections are typically a city collection-system tap; OC San does not directly bill the homeowner for ADU connection.
  • Electric: Anaheim Public Utilities (APU) · 21d connect · $1,900
    APU is a municipal electric utility (an SCPPA member). APU rates are typically lower than Southern California Edison's. New ADU service drop or panel upgrade typical for detached units; separate meter optional.
  • Gas: Southern California Gas Company (SoCalGas) · 30d connect · $1,500
    Anaheim does not operate a municipal gas utility; SoCalGas serves Anaheim residential customers. Many ADU builders now spec all-electric heat pumps to skip the gas extension entirely.

Property values & taxes

Median value$842,990
Median tax$9,609/yr
Effective rate1.1%

Construction timeline

Detached build22 weeks
Conversion12 weeks
Contractor lead4 months

Realistic total: best 6mo · typical 10mo · worst 16mo

Deep OC contractor pool means lead times are moderate. ADU Express + a Pre-Approved Plan Catalogue choice can compress timeline below 8 months total.

Modular pathway inspectors are experienced with modular

Financing

Fannie Mae ADUeligible

State ADU loans:

Insurance impact

Annual premium delta$680
Landlord policyrecommended
Umbrella threshold$1M umbrella when renting; $2M for STR

Anaheim is in low wildfire-exposure territory (urban OC), so the FAIR Plan availability crisis affecting Sierra and coastal-canyon CA does not materially apply. Standard market carriers remain available.

HOA prevalence & preemption

State HOA preemptionyes

Anaheim Hills, Platinum Triangle townhome / condo communities, and several master-planned subdivisions have HOAs. California's combined AB 670 (2019) + AB 3182 (2020) preemption voids covenants prohibiting ADUs and rental restrictions below 25% of separate interests. Some HOA design-standards regimes can still delay ADU approval per the 2026 Carlsbad case precedent.

Regulatory overlays (4)

  • airport-noise-zone
    Northwest Anaheim parcels lie under the FAA's Long Beach Airport (LGB) and Fullerton Airport approach zones, with noise contour overlays that affect residential construction. South Anaheim is influenced by John Wayne Airport (SNA) climbout patterns.
  • other
    Disneyland Resort Specific Plan (SP 92-1, Anaheim Municipal Code Chapter 18.114) covers ~490 acres around the Disneyland Resort. Parcels within the SP follow the Specific Plan zoning rather than Section 18.38.015 standards. The Anaheim Resort Specific Plan and Platinum Triangle Master Land Use Plan are similar overlays elsewhere in the city.
  • seismic-retrofit-zone
    All of Orange County is in California seismic design category D for the IBC/CRC. Newport-Inglewood / Whittier fault systems cross the metro.
  • flood-zone
    Portions of Anaheim along the Santa Ana River corridor and Carbon Canyon Channel are mapped FEMA SFHAs. Most Anaheim residential parcels are outside SFHA but localized flooding risks exist near drainage infrastructure.
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone3B
Heating degree days1,300
Cooling degree days1,500
Design low / high39°F / 95°F
Wind design speed100 mph
Seismic design cat.D
Annual rainfall13"
Wildfire exposurelow
Energy codeTitle 24
Version / adopted2025 / 2026
Solar requiredyes
EV-ready requiredyes

Building code

Base codeCRC
Version year2,025
Adopted2026
Fire sprinkleruniversal
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-38 min
Wall R-valueR-13 min

Amendments:

  • Amendment
  • Amendment

Contractor market (aggregate)

Licensed residential GCs2,400
ADU-specialist GCs165
Median GC size (employees)9
Laborer median wage$27/hr

Known issues (1)

  • other — Disneyland Resort Specific Plan (SP 92-1), Anaheim Resort Specific Plan, and Platinum Triangle Master Land Use Plan overlays govern parcels within those areas. Owners on those parcels follow the Specific Plan standards rather than Section 18.38.015 — most of those overlay areas are non-residential, so few SFR ADU projects are affected, but verify before assuming Section 18.38.015 applies.
Orange County — county ADU rules and overlays

County ADU ordinance

California state — ADU law and programs

State ADU law

California has the most aggressive statewide ADU preemption regime in the US, built from ~15 bills passed 2019-2025 and enforced by the Department of Housing and Community Development (HCD). The 2026 HCD ADU Handbook addendum (in effect with the 2025 Title 24 code cycle) is the operative state-level reference. The regime does four things at once: (1) preempts local zoning that would ban or unreasonably restrict ADUs; (2) imposes by-right ministerial approval with short statutory deadlines; (3) caps fees and utility-connection charges; and (4) empowers HCD to void non-compliant local ordinances.

State HOA preemption

California has the strongest statewide HOA-preemption regime in the US for accessory dwelling units, built from two bills: AB 670 (2019) voided ADU-prohibiting covenants on single-family residential lots, and AB 3182 (2020) extended and codified the preemption into the Davis-Stirling Common Interest Development Act (Civil Code §§ 4740 / 4741). The combination prohibits common-interest communities from banning ADUs, restricting rentals below 25% of separate interests, or treating ADUs as separate HOA interests. Limits remain: HOAs retain authority over reasonable design standards and statutory height limits, and the 2026 Carlsbad case (CalMatters coverage) established that an HOA's documented design-standards regime can effectively delay or constrain ADU approval short of outright prohibition.

State financing programs

California's flagship state-level ADU financing program — the CalHFA ADU Grant Program — is paused and has not been refunded since the original $100 million allocation was fully deployed 2023-12-28. The program provided up to $40,000 per qualifying homeowner for pre-construction and non-recurring closing costs and financed approximately 2,500 ADUs in two rounds. As of 2026-04, no new funding round has been announced in the state budget. CalHFA continues to publish anti-scam warnings because bad actors actively solicit homeowners claiming access to grant funds that no longer exist. State-level financing activity has shifted to local pilot programs (San Francisco, San Jose, Los Angeles, San Diego) and private financing products (Fannie Mae ADU mortgage, HELOC, construction-to-permanent).

State housing programs

California's state-level ADU programs are concentrated at HCD (technical guidance, ordinance review, enforcement) and the paused CalHFA grant pipeline (covered under stateFinancing). The state does not operate a central pre-approved ADU plan library — instead, AB 1332 (2024) created a preemption framework for local pre-approved plans with a 30-day ministerial-approval deadline, and major cities (Los Angeles, San Diego, San Jose, Sacramento, Berkeley) have rolled out their own plan catalogs. The California YIMBY coalition and other housing-policy organizations play an influential role in bill drafting; they are not state agencies but effectively drive much of the ADU legislative agenda. The Title 24 code cycle (now 2025, in effect for 2026 permits) is the authoritative building-code baseline.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Codes

  • 92801
  • 92802
  • 92804
  • 92805
  • 92806
  • 92807
  • 92808

Post Office

  • 1180 W Ball Rd, 92812
  • 2255 W Ball Rd, 92814
  • 2320 E Lincoln Ave, 92816
  • 5505 E Santa Ana Canyon Rd, 92817
  • 701 N Loara St, 92803

Locale Names