Franklin

Warren County portion

ADU Pass helps homeowners in Franklin, Warren County, Kentucky navigate the permit paperwork for building an accessory dwelling unit. This area covers 1 ZIP code.

1 ZIP code

ADU details

ADU legality: with-restrictions

Stateunclear (Kentucky Revised Statutes Chapter 100; KBC IRC 2018) — No statewide ADU preemption. KRS 100 enables joint and county-only planning units; Warren County's planning unit is administered by the City-County Planning Commission of Warren County in Bowling Green - it covers Bowling Green and unincorporated Warren only, not Franklin / Simpson.
Countyno-jurisdiction (Warren County does not regulate Franklin (Simpson County seat)) — Warren County's planning, building, and code-enforcement authority stops at the Simpson County line. A homeowner in Franklin city does not file with Warren County; they file with the Franklin-Simpson Joint Planning Commission. This file's 'county' tier is informational only - the controlling county is Simpson.
Citywith-restrictions (City of Franklin (Simpson County seat) - 117 W. Cedar St., Franklin, KY 42134) — Through the Franklin-Simpson Joint Planning Commission, Franklin enforces the joint zoning manual. ADU-style second units require a Conditional Use Permit; no defined ADU class exists. Phone +1-270-596-2756; email Zoning@franklinky.org.

Same controlling code as the no_county/franklin and (canonical) simpson-county/franklin files: Franklin-Simpson joint zoning manual, CUP-driven ADU pathway, Kentucky DHBC residential building permit. The Warren County slug is wrong - leaving this stub in place documents the slug collision rather than implying a separate ruleset.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 400 $1,900 $76,000 $77,900
600 600 $2,300 $114,000 $116,300
midpoint 800 $2,700 $152,000 $154,700
maximum 1,200 $3,500 $240,000 $243,500
Fee breakdown (as of 2026-04)
Plan review$350
Building permit$750
Utility connection$750
Total$2,300

Permitting process

Typical duration76 days
Backlog21 days
  1. Reject Warren County intake; route to Franklin-Simpson (~1d)
    Confirm with Warren County City-County Planning Commission (Bowling Green) that the parcel is in Franklin / Simpson and outside their jurisdiction. They will redirect to Franklin-Simpson Joint Planning at +1-270-596-2756.
  2. Pre-application meeting at Franklin-Simpson Joint Planning (~7d)
    Schedule pre-app at 117 W. Cedar St. (City) or 100 Courthouse Sq (County). Confirm zoning district and applicable lot/setback/parking standards from the joint manual.
  3. File Conditional Use Permit application (~14d)
    Submit CUP application with site plan, floor plan, elevations, and CUP-fee check to City Hall (Zoning@franklinky.org).
  4. Public notice + neighbor mailing (~10d)
    Joint planning office mails notice to property owners within statutory radius and publishes in The Franklin Favorite ~10 days before hearing.
  5. Planning Commission public hearing (~1d)
    Monthly meeting (typically third Tuesday). Commission decides CUP.
  6. Building permit application to KY DHBC (~7d)
    After CUP approval, submit residential construction application to Kentucky DHBC; CUP letter is part of the package.
  7. DHBC plan review (~21d)
    State plan reviewer issues approval or comment letter; backlog 2-4 weeks.
  8. Construction inspections + final / CO (~7d)
    DHBC field inspector handles foundation/framing/MEP/insulation/final. Joint planning issues a separate zoning compliance letter at completion.

Viability (permitted uses)

  • Long-term rental: yes (Permitted as accessory residence under CUP) Long-term rental of a CUP-approved accessory residence is the dominant pattern.
  • Short-term rental: with-restrictions (Joint zoning manual STR / tourist-home provisions) STR (Airbnb / VRBO) treated as a tourist home / B&B use under the joint manual; CUP required in residential zones.
  • Office rental: no Joint manual restricts ADU / accessory residence to dwelling use.
  • Home office: yes Home occupation explicitly allowed in residential zones.
  • Studio / workshop: yes Owner / family use is unrestricted.
  • Agriculture: with-restrictions (A-1 Agricultural district) Farmhand / caretaker accessory residence is one of the recognized CUP cases on A-1 parcels.
  • Relative support: yes Family-occupancy ADU is the most common CUP basis.

Incentives

Contacts

DepartmentFranklin-Simpson Joint Planning Commission (canonical) - Warren County has no jurisdiction here

Staff: City of Franklin Planning Office (Permit / CUP intake), Simpson County Planning & Zoning (County-side intake (100 Courthouse Sq)), Warren County City-County Planning Commission (informational only) (Bowling Green / Warren only - not Franklin)

Utilities

  • Water: City of Franklin Water and Wastewater (TVA-region wholesale) · 21d connect · $700
  • Sewer: City of Franklin Wastewater (Big Trammel Creek WWTP) · 21d connect · $800
  • Electric: Franklin Electric Plant Board (TVA wholesale) · 14d connect · $650
  • Gas: Atmos Energy · 21d connect · $1,100

Property values & taxes

Median value$198,000
Median tax$1,750/yr
Effective rate0.9%

Market rent by ADU size

Sq ftRent
400$850/mo
600$1,050/mo
800$1,275/mo
1,200$1,650/mo

Construction timeline

Detached build24 weeks
Conversion14 weeks
Contractor lead5 months

Realistic total: best 7mo · typical 11mo · worst 17mo

Bowling Green / Warren GC backlog feeds into Simpson; lead times marginally longer than deeper-rural KY.

Modular pathway Kentucky DHBC Manufactured/Modular Housing Program · inspectors are regular with modular · 2 modular permits (last 24mo)

I-65 access excellent; oversize-load route runs straight up I-65 from Tennessee modular plants.

Financing

Typical HELOC8.6%
Cash-out refi avg7.4%
Fannie Mae ADUeligible

State ADU loans:

Insurance impact

Annual premium delta$410
Landlord policyrecommended
Umbrella threshold$1M umbrella when long-term renting

Hail / wind exposure on the southern Kentucky border; karst sinkhole rider available.

HOA prevalence & preemption

% parcels under HOA12%
State HOA preemptionno

Newer subdivisions on the north side of Franklin (toward I-65 / Warren line) carry HOAs; older town blocks do not. Kentucky has no HOA-ADU preemption.

Regulatory overlays (2)

  • other — Karst / sinkhole exposure: Simpson County sits on the western edge of the central-Kentucky karst belt; sinkhole-formation potential is real on parcels south and east of Franklin. · +7d · +4% cost
    Note: Warren County to the north sits on even deeper karst (Mammoth Cave / Lost River system) - if parcel were actually in Warren rather than Simpson, karst impact would be larger. (map)
  • flood-zone — FEMA Zone A on Big Trammel Creek and Drake Creek (Simpson side); on the Warren side, Barren River / Drakes Creek are the controlling streams (not relevant to Franklin city). · +10d · +6% cost
    Lowest finished floor 1 ft above BFE; flood vents on enclosed below-base areas. (map)
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone4A
Heating degree days4,150
Cooling degree days1,650
Design low / high16°F / 93°F
Frost depth16"
Design snow load10 psf
Wind design speed115 mph
Seismic design cat.B
Annual rainfall51"
Wildfire exposurelow
Energy codeIECC
Version / adopted2018 / 2020

Building code

Base codeKentucky Residential Code (IRC 2018 with KY amendments)
Version year2,018
Adopted2020
Fire sprinklernone
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-49 min
Wall R-valueR-20 min

Amendments:

Contractor market (aggregate)

Licensed residential GCs38
ADU-specialist GCs4
Laborer median wage$24/hr
Typical GC markup18%

Known issues (2)

  • data-classification (since ongoing) — Misleads downstream consumers who expect a Warren County jurisdiction. Canonical record is Simpson County. (source)
  • regulatory-gap (since ongoing) — Every ADU runs as a CUP, adding 4-6 weeks vs. by-right. (source)
Kentucky state — ADU law and programs

State financing programs

Kentucky does not operate an ADU-specific statewide loan, grant, or forgivable-loan program. The Kentucky Housing Corporation (KHC) is the state housing finance agency and administers first-time-homebuyer mortgage products, the Welcome Home Grant (down-payment assistance), the KHC Down Payment Assistance Program (up to $12,500 second mortgage), and Mortgage Credit Certificates. None target ADU construction directly. ADU costs may be financed through standard renovation or construction-loan products under KHC programs when the ADU is part of a qualifying primary-residence transaction.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Code

  • 42170

Post Office

  • 619 N Main St, 42134