Arlington

ADU Pass helps homeowners in Arlington, Calhoun County, Georgia navigate the permit paperwork for building an accessory dwelling unit. This area covers 1 ZIP code.

1 ZIP code

ADU details

ADU legality: unclear

Stateunclear (Georgia has no statewide ADU statute; OCGA Title 36 Chapter 66 (Zoning Procedures Law) delegates land-use authority to local governments) — Georgia delegates ADU regulation entirely to local governments. State minimum building code is the Georgia amendments to the IRC (2018 cycle for legacy permits, 2024 cycle effective 2026-01-01); IRC R313 residential sprinkler mandate is removed by GA amendment.
Countyunclear (Calhoun County, Georgia is largely unzoned; building regulation primarily through the Georgia state minimum building code and county building inspector) — Calhoun County, GA (county seat Morgan, pop ~6,000) is one of the small Southwest Georgia counties without comprehensive county zoning. Land use outside city limits is governed largely by state minimum codes and case-by-case county review. Arlington straddles Calhoun and Early counties.
Cityunclear (City of Arlington, Georgia - municipal corporation; ordinances are not in Municode and are administered locally) — Arlington is a small town (pop ~1,200) governed by Mayor Jerome Brackins and council; its building/zoning function is handled through the Code Enforcement Office at City Hall. Arlington does not publish a comprehensive online zoning code on Municode. ADU candidates must contact the city directly to confirm what is permitted on a given parcel; expect accessory-building rules and lot-size minimums consistent with rural Georgia practice.

Arlington is a rural Southwest Georgia town. The path is small-town: confirm with the Code Enforcement Office in person. There is no online portal, no dedicated ADU ordinance, and no published checklist. Owners should bring a hand-drawn site plan and a draft building plan to City Hall for an initial conversation.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 150 $1,500 $32,250 $33,750
600 600 $1,500 $129,000 $130,500
midpoint 525 $1,500 $112,875 $114,375
maximum 900 $1,500 $193,500 $195,000
Fee breakdown (as of 2026-04)
Plan review$250
Building permit$500
Total$1,100

Permitting process

Typical duration55 days
Backlog10 days
  1. In-person inquiry at Arlington City Hall (~3d)
    Walk in or call Arlington City Hall (229-725-4276) and ask for the Code Enforcement officer. Arlington has no published ADU pathway; the conversation establishes whether the parcel is in city limits, the city's expectations on setbacks/lot coverage, and whether a third-party plan reviewer (often hired by the city for residential plan check) will be involved.
  2. Confirm county-side service responsibilities (~7d)
    If the parcel is on a private well or septic, contact the Calhoun County Health Department (Southwest Health District) for environmental health approvals - those operate independently of city building permits. Confirm with Calhoun County Tax Assessor that the parcel sits in the city versus unincorporated jurisdiction.
  3. Prepare site plan and basic construction drawings (~14d)
    Hand-drawn site plan acceptable for sketch review. For permit submittal, Georgia state minimum code requires plans showing structural, electrical, plumbing, mechanical layouts. For ADUs over 1,500 sqft a Georgia-licensed designer stamp is required by state code, but Arlington-typical ADUs (under 900 sqft) can use prescriptive IRC compliance.
  4. Submit application at City Hall (~1d)
    Arlington has no online portal. Submit a paper building permit application, plans, and any city-required signatures in person at 567 Pioneer Rd NE, Arlington, GA 39813. Typical small-Georgia-town permit application asks for owner info, contractor license number, project description, valuation, and site plan.
  5. Plan review (city + state-required third-party reviewer) (~21d)
    Arlington often contracts third-party plan review for residential code compliance because the city does not staff a full-time building inspector. Review checks 2024 IRC GA-amended compliance, electrical (NEC 2023 GA amendments), plumbing (IPC), mechanical (IMC). One to two correction cycles typical.
  6. Pay permit fees and issue permit (~3d)
    Arlington fee schedule is set by city ordinance and typically billed at a flat rate plus per-square-foot multiplier. No city ADU impact fee. Calhoun County does not impose unincorporated impact fees that would attach inside city limits.
  7. Construction inspections
    Inspections by the city Code Enforcement officer or by the contracted third-party inspector. Foundation, framing, rough MEP, insulation, final - scheduled by phone with City Hall. Travel-time scheduling can mean inspector visits batched once per week.
  8. Certificate of Occupancy (~5d)
    CO issued after final inspection clears. ADU then eligible for occupancy. Connect Calhoun County / Three Notch EMC for permanent power; Arlington Water/Sewer for utility activation.

Viability (permitted uses)

  • Long-term rental: yes Long-term rental of ADU generally permitted; landlord-tenant law and any city rental-registration ordinance apply.
  • Short-term rental: with-restrictions STR rules vary by city. Arlington regulates STRs separately from ADU permitting; check local STR ordinance and HOA covenants.
  • Office rental: with-restrictions Detached office rental requires home occupation permit or rezoning.
  • Home office: yes Home occupation permitted with restrictions on signage and customer traffic.
  • Studio / workshop: yes Personal artist studio is a permitted accessory use.
  • Agriculture: with-restrictions Limited urban agriculture permitted in residential zones; livestock varies by district.
  • Relative support: yes Family-occupancy ADU explicitly permitted in single-family zones.

Contacts

DepartmentCity of Arlington City Hall (combined administration including Code Enforcement)

Staff: Mayor Jerome Brackins (Mayor (council meetings second Tuesday at 7:00pm)), Council members (Lisa Aldridge, Leonard Davis, Tyron George), Arlington Code Enforcement Office (Building permits, code compliance (small-staff, contact City Hall)), Calhoun County (Morgan, GA) Tax Assessor / county-side reference (Parcel verification (city limits vs unincorporated)), Southwest Health District - Calhoun County Environmental Health (On-site septic and well approvals when applicable)

Utilities

  • Water: Arlington Water Utility · 30d connect · $4,500
  • Sewer: Arlington Sewer / Wastewater · 30d connect · $5,500
  • Electric: Arlington Electric Utility · 21d connect · $1,800
  • Gas: Arlington Gas Utility · 30d connect · $1,500

Property values & taxes

Median value$350,000
Median tax$3,500/yr
Effective rate1%

Construction timeline

Detached build24 weeks
Conversion14 weeks
Contractor lead3 months

Realistic total: best 7mo · typical 10mo · worst 16mo

Financing

Insurance impact

Annual premium delta$380
Landlord policyrecommended
Umbrella threshold$1M umbrella when renting

HOA prevalence & preemption

State HOA preemptionno

Georgia has no HOA-ADU preemption; HOA covenants restricting ADUs are enforceable.

Technical envelope (climate & building code)

Climate & energy code

IECC climate zone3A
Heating degree days2,800
Cooling degree days2,000
Design low / high18°F / 94°F
Frost depth8"
Design snow load5 psf
Wind design speed115 mph
Seismic design cat.B
Annual rainfall54"
Wildfire exposurelow
Energy codeIECC
Version / adopted2015 / 2020

Building code

Base codeIRC
Version year2,015
Adopted2020
Fire sprinklernone
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-38 min
Wall R-valueR-13 min

Amendments:

  • Amendment
  • Amendment
Georgia state — ADU law and programs

State financing programs

Georgia does not operate an ADU-specific statewide loan, grant, or forgivable-loan program. The Georgia Department of Community Affairs (DCA) administers the Georgia Dream homeownership program, which includes the Georgia Dream Standard, Georgia Dream Hardest Hit Fund DPA, and (effective 2025-07-01) the Georgia Dream Peach Advantage Loan Program for expanded down-payment assistance. None target ADU construction directly; an ADU-bearing primary residence can qualify for the underlying Georgia Dream first mortgage when other eligibility criteria are met.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Code

  • 39813

Post Office

  • 438 Pioneer Rd NW, 39813