29 ZIP codes

ADU details

ADU legality: allowed

Stateallowed (California Government Code 65852.2 / 65852.22 (AB 68/881/671/3182, SB 13, AB 1033, AB 976, SB 897, AB 2221, AB 1332)) — California ADU statute preempts most local restrictions: 60-day ministerial review, owner-occupancy permanently barred (AB 976, 2024-01-01), HOA covenants void (AB 670/3182), impact-fee waiver under 750 sqft (SB 13), mandatory pre-approved-plan track (AB 1332, effective 2025-01-01), and a 30-day approval target for projects using preapproved designs.
Countyallowed (Sacramento County Zoning Code Chapter 5.9 (applies in unincorporated Sacramento County only)) — Sacramento County's ADU rules and the County's free Shelf-Ready ADU plan program govern unincorporated parcels. Within the City of Sacramento limits the City's Planning and Development Code Section 17.228.105 plus state law are controlling; county zoning does not apply.
Cityallowed (City of Sacramento Planning and Development Code Section 17.228.105 (Accessory Dwelling Units and Junior Accessory Dwelling Units)) — Section 17.228.105 (most-recent restatement under Ord. 2024-0051, eff. 2024-12-10) permits up to two ADUs, or one ADU plus one JADU, or two JADUs on a single-unit-dwelling lot; on a duplex or multi-unit lot up to two ADUs. Density does not count the ADU. The city operates a published Preapproved ADU Program at adu.cityofsacramento.org satisfying AB 1332. HCD's Jan-2026 review letter found Section 17.228.105 fails to comply with state ADU law in some respects; the city was given until Feb 20, 2026 to respond.

Permitted by-right under ministerial review. Sacramento offers an ADU Resource Center at adu.cityofsacramento.org and the Preapproved ADU Program (AB 1332 implementation) to fast-track detached ADUs to a 30-day approval where eligible.

Cost scenarios

ScenarioSq ft PermitBuildTotal
minimum 400 $5,200 $220,000 $225,200
600 600 $7,600 $312,000 $319,600
midpoint 700 $8,800 $364,000 $372,800
1000 1,000 $14,500 $540,000 $554,500
maximum 1,200 $17,500 $648,000 $665,500
Fee breakdown (as of 2026-04)
Plan review$4,400
Building permit$5,800
Total$10,700

Permitting process

Typical duration56 days
Backlog14 days
  1. Determine track: Preapproved (AB 1332) vs custom (~5d)
    Preapproved Program at cityofsacramento.gov/community-development/building/building-programs/preapproved-adu-program-ab1332 lists registered plans; eligible projects target 30-day approval per AB 1332. Custom designs follow the standard plan-review track.
  2. Submit ADU application (CDD-0009) (~1d)
    Submit Accessory Dwelling Unit Application Form CDD-0009 plus plans. Public Counter at 300 Richards Blvd., 3rd Floor, Sacramento, CA 95811 (Tue-Thu 9am-3:30pm by appointment); intake also accepted by Department of Community Development electronic submittal channels. Help Line (916) 264-5011.
  3. Initial completeness check (~15d)
    Community Development confirms application is complete within 15 business days per state-law deemed-complete rule.
  4. First plan review (Building, Planning, Sacramento Fire, MEP) (~28d)
    Concurrent review across Building, Planning (zoning clearance under Section 17.228.105), Sacramento Fire, and MEP. With complete documents most apps move through plan review in 4-8 weeks.
  5. Subsequent plan-review cycles (~14d)
    Corrections cycle; one or two cycles typical for non-preapproved designs.
  6. Permit issuance (~5d)
    Fees paid; permit downloaded. Total ministerial limit is 60 days from complete submittal per state law (30 days for preapproved-plan track).
  7. Construction inspections
    Foundation, framing, MEP rough, insulation, drywall, final. Inspection requests through the Building permit-services channels.
  8. Certificate of occupancy (~5d)
    Final inspection pass triggers CO; ADU eligible for occupancy and rental.

Viability (permitted uses)

  • Long-term rental: yes (California Government Code 65852.2(a)(7)) 30+day rental of ADU explicitly permitted; AB 976 owner-occupancy preemption (2024-01-01) makes the ADU eligible as a conventional rental. AB 1482 statewide rent cap (5% + CPI, max 10%) may apply to multifamily-zoned conversions.
  • Short-term rental: with-restrictions (Sacramento City Code STR registration / TOT requirements) Sacramento regulates STRs separately from ADU permitting.
    • STR registration with City required
    • Transient Occupancy Tax (TOT) collection
    • Primary-residence status often required for full-unit STR
  • Office rental: no Section 17.228.105 limits ADUs to dwelling-unit use; commercial office tenancy not permitted in residentially-zoned ADU.
  • Home office: yes Home occupation permit available citywide; signage and customer-traffic limits apply.
  • Studio / workshop: yes Personal artist/workshop use is a permitted accessory residential use.
  • Agriculture: with-restrictions Sacramento city limits cover urban/suburban zoning; small-scale urban agriculture permitted; ADU itself remains residential.
  • Relative support: yes Family-occupancy ADU explicitly permitted; JADU (under 500 sqft) specifically designed for owner+relative arrangement.

Incentives

Pre-approved plans City of Sacramento Preapproved ADU Program (AB 1332) · saves ~4 weeks

Contacts

DepartmentCity of Sacramento Community Development Department - Building Division & Planning Division

Staff: Permit Services Help Line (Building Division - Permit Counter), Public Counter (300 Richards Blvd., 3rd Floor) (Permit Services - Public Counter), ADU Resource Center (ADU Sacramento (online toolkit))

Contractor directory (6)

Scope: city.

General Contractor (6)

Utilities

  • Water: City of Sacramento Department of Utilities (Water) · 30d connect · $4,200
  • Sewer: City of Sacramento Department of Utilities (Wastewater) for ~75,000 city customers; OR Sacramento Area Sewer District (SASD); Regional San (Sacramento Regional County Sanitation District) treats wastewater regionally · 30d connect · $4,800
  • Electric: Sacramento Municipal Utility District (SMUD) · 21d connect · $2,200
  • Gas: Pacific Gas & Electric (PG&E) · 30d connect · $1,800

Property values & taxes

Median value$470,000
Median tax$5,170/yr
Effective rate1.1%

Market rent by ADU size

Sq ftRent
400$1,450/mo
600$1,850/mo
800$2,200/mo
1,000$2,500/mo

Construction timeline

Detached build24 weeks
Conversion14 weeks
Contractor lead4 months

Realistic total: best 7mo · typical 12mo · worst 20mo

Sacramento metro GC market is deeper than Elk Grove or rural Central Valley but shallower than Bay Area. American/Sacramento River SFHA parcels (Natomas, Pocket, Land Park, Little Pocket) add elevation-certificate and flood-resistant construction overhead. Historic districts (Capitol Mansions, Boulevard Park, Newton Booth, Oak Park, Alkali Flat, Old Sacramento) trigger Preservation Commission review on visible alterations.

Modular pathway California HCD Factory-Built Housing Program · inspectors are occasional with modular

Sacramento Valley access via I-5, I-80, US 50, Highway 99; downtown grid (J/K/L Streets, midtown alleys) restricts module width; Pocket/Land Park/East Sac established neighborhoods have narrow legacy lots.

Financing

Typical HELOC8.5%
Cash-out refi avg7.4%
Fannie Mae ADUeligible

State ADU loans:

Insurance impact

Annual premium delta$560
Landlord policyrecommended
Umbrella threshold$1M umbrella when long-term renting; $2M when STR-renting in Pocket/Natomas flood-zone

California-wide insurer pullback affects rate quotes; American/Sacramento River SFHA parcels carry NFIP requirement when financed federally. Sacramento Valley wildfire exposure on city parcels is materially below Sierra-foothill markets.

HOA prevalence & preemption

% parcels under HOA18%
State HOA preemptionyes
Preemption citationCalifornia Civil Code 4740 / 4741 (AB 670 / AB 3182)

Sacramento city core is predominantly fee-simple single-family / midtown grid layout with low HOA prevalence. North Natomas master-planned communities (Sterling Pointe, Park Meadows, Westshore) carry HOAs; state law voids HOA covenants prohibiting ADUs but reasonable design standards remain enforceable.

Regulatory overlays (3)

  • flood-zone — FEMA SFHA along American River corridor (Natomas Basin, lower Sacramento River, Pocket, Little Pocket, Land Park edges, Riverside neighborhoods); Sacramento County is divided into Natomas, north of American River, south of American River, and Delta flood-management zones. · +21d · +7% cost
    American River Flood Control District plus SAFCA coordinate levee maintenance; elevation certificates and flood-resistant construction required for SFHA parcels; NFIP coverage required for federally-backed loans. (map)
  • historic-district — Multiple Sacramento Historic Districts including Capitol Mansions, Boulevard Park, Newton Booth, Oak Park, Alkali Flat, Sutter's Fort/Marshall School, Old Sacramento, plus the central downtown grid layout (J/K/L Streets historic blocks). · +30d · +8% cost
    Preservation Director and (where applicable) Preservation Commission review for visible exterior alterations; design review on detached ADUs visible from public right-of-way. (map)
  • airport-noise-zone — Sacramento Executive Airport (KSAC) and Sacramento International (KSMF) noise contours affect parts of South Sacramento and North Natomas. · +7d · +3% cost
    Sound-attenuation construction may be required in 65+ CNEL contours. (map)
Technical envelope (climate & building code)

Climate & energy code

IECC climate zone3B
Heating degree days1,450
Cooling degree days1,500
Design low / high32°F / 100°F
Wind design speed96 mph
Seismic design cat.D2
Annual rainfall18"
Wildfire exposureLow
Energy codeCalifornia Title 24
Version / adopted2025 / 2026-01-01
Solar requiredyes
EV-ready requiredyes

Building code

Base codeCalifornia Residential Code (CRC)
Version year2,025
Adopted2026-01-01
Fire sprinkleruniversal
Egress window5.7 sqft min
Min ceiling7 ft
Attic R-valueR-38 min
Wall R-valueR-13 min

Amendments:

  • Sacramento Local Building Code Amendments — Sacramento adopts CRC/CBC with local amendments addressing levee/floodplain elevation, soils for the Sacramento Valley alluvial profile, and historic-district preservation.

Contractor market (aggregate)

Licensed residential GCs2,400
ADU-specialist GCs95
Laborer median wage$28/hr

Known issues (1)

  • policy-review (since 2026-01) — California HCD issued findings in Jan 2026 that Sacramento's ADU code (as restated under Ord. 2024-0051) fails to comply with State ADU Laws in specified respects. City was given until 2026-02-20 to respond. Anticipated amendment cycle to Section 17.228.105 in 2026. (source)
Sacramento County — county ADU rules and overlays

County ADU ordinance

Sacramento County regulates ADUs on unincorporated parcels under its Zoning Code (Title 3, Chapter 5.4), adopted by the Board of Supervisors in 2020 and most recently updated in 2023 to conform with California's subsequent ADU preemption package. The county permits up to one ADU plus one JADU per single-family parcel ministerially, and the state-mandated two ADUs per multifamily lot; parking is not required within one-half mile of transit. The county ordinance layers the locally-controlled parameters (setbacks, design standards, objective height limits, fire-safe construction in WUI zones, Delta Primary Zone siting constraints, floodway restrictions) on top of California Government Code Sections 65852.2 (ADU) and 65852.22 (JADU), which preempt most local ADU regulation statewide. The county has adopted the state statutory framework of AB 68 / AB 881 (2019), SB 13 (2019 fee relief), AB 976 (2019 owner-occupancy removal through 2024, extended under subsequent amendments), AB 2221 / SB 897 (2022 design-review and permit-timeline clarifications), AB 1033 (2023 optional condo-separation — Sacramento County has NOT adopted an AB 1033 program as of 2026-04-20), AB 976-successor (permanent preemption of owner-occupancy rules), AB 2533 (2024 amnesty for unpermitted ADUs built before 2020), and SB 543 (2024 impact-fee clarifications). Distinct county-level contributions on top of the state floor are the Delta Primary Zone siting constraints administered jointly with the Delta Protection Commission, the Williamson Act contract-land provisions limiting ADU construction on parcels under active agricultural-preserve contracts, the Airport Land Use Compatibility Plan (ALUCP) review for ADUs within the Mather Field, Sacramento Executive, Sacramento International, and Franklin Field influence areas, and the Natomas Basin Habitat Conservation Plan (NBHCP) fees/review for ADUs constructed within the Natomas Basin.

State-floor overlay: California state law (Gov. Code 65852.2, 65852.22) preempts most local ADU regulation. The state sets ministerial-approval requirements, caps fees, mandates 60-day permit review, forbids local owner-occupancy requirements (AB 976 and successor amendments making the removal permanent), sets minimum allowed sizes (850 sqft one-bedroom, 1,000 sqft two-bedroom), forbids parking requirements within one-half mile of transit or on replacement-covered-parking ADUs, and caps impact fees at zero for ADUs under 750 sqft. Sacramento County's ordinance reiterates and applies these floors, adding only the locally-controlled Delta, Williamson Act, airport, WUI, and floodplain overlays. Where a project sits in the Delta Primary Zone, a Williamson Act contract parcel, a Very High Fire Hazard Severity Zone, a FEMA Special Flood Hazard Area, or an Airport Influence Area, state ADU preemption still applies to the ADU allowance itself but does not preempt the county's separate authority over those overlay regimes.

County regulatory overlays

Sacramento County administers or co-administers several overlay regimes that materially affect ADU siting on unincorporated parcels: (1) the Delta Primary Zone, established under the Delta Protection Act (Pub. Res. Code Division 19.5) and administered jointly by the Delta Protection Commission and Sacramento County, which constrains residential development on the roughly 500,000-acre agricultural core of the Sacramento-San Joaquin Delta; (2) FEMA Special Flood Hazard Areas (SFHA) along the Sacramento River, American River, Cosumnes River, Mokelumne River, Dry Creek, and Delta sloughs, with floodway and floodplain restrictions enforced jointly with the 50+ local Reclamation Districts that maintain levees across the Delta and Natomas Basin; (3) Very High Fire Hazard Severity Zones (VHFHSZ) designated by CAL FIRE covering the eastern foothill fringes approaching Folsom Lake and the Cosumnes River gorge toward El Dorado County; (4) Williamson Act agricultural preserve contract lands covering roughly 290,000 acres of unincorporated farmland, which restrict non-agricultural construction (including ADUs unless they support the contract's agricultural use); (5) Airport Land Use Compatibility Plans (ALUCP) administered by the Sacramento Area Council of Governments (SACOG) Airport Land Use Commission covering Sacramento International, Sacramento Executive, Mather Field, Rio Linda Airport, and Franklin Field; and (6) the Natomas Basin Habitat Conservation Plan (NBHCP), a federally-approved HCP covering roughly 53,000 acres of the Natomas Basin that imposes mitigation-fee and take-permit requirements on residential construction. Coastal Commission jurisdiction does not apply to Sacramento County (the county is not coastal). Seismic-retrofit overlays are not a county-administered regime in Sacramento County; California seismic building-code compliance applies statewide through the California Building Code adopted by the county.

  • Delta Primary Zone — Delta Protection Commission / Sacramento County joint administration — ADUs on existing residential parcels inside the Primary Zone are permitted but reviewed for LURMP consistency. New residential parcels cannot be created in the Primary Zone and ADUs cannot be used to effectively subdivide agricultural land. Delta Protection Commission advisory review adds roughly 30-45 days to the overall ADU timeline, though the state ADU 60-day ministerial clock runs in parallel and cannot be extended beyond state limits.
  • FEMA Special Flood Hazard Areas (SFHA) and Reclamation District levee-protected lands — ADUs in an SFHA require lowest-floor elevation to or above Base Flood Elevation plus one foot of county freeboard, flood vents on enclosures below BFE, structural anchoring, and a post-construction Elevation Certificate. In the Natomas Basin, the 2008-era FEMA de-accreditation of the levee system was resolved via the multi-billion-dollar Natomas Levee Improvement Program completed in stages through 2021, restoring A99 mapping; owners should verify current effective FIRM panel before design. Delta-island ADUs face case-by-case elevation requirements depending on the reclamation district's levee certification status and applicable FEMA panel.
  • CAL FIRE Very High Fire Hazard Severity Zones (VHFHSZ) — foothill fringe — An ADU in a VHFHSZ must comply with California Building Code Chapter 7A (WUI-rated exterior materials: ignition-resistant siding, dual-pane windows, 1/8-inch-max vent screens, Class A roofing, non-combustible eaves / soffits / decks), minimum 100-foot defensible space per Pub. Res. Code Section 4291, minimum driveway width and turnaround per fire-district standards, and minimum fire-flow water supply (2,500 gpm residential standard, reduced for sprinklered ADUs per California Residential Code Section R313). The WUI premium on ADU construction cost in VHFHSZ areas runs an estimated 6-12% over comparable non-WUI construction.
  • Williamson Act agricultural-preserve contract lands — An ADU on a Williamson Act parcel requires a county finding that the ADU is compatible with the contract's agricultural use. A non-farming rental ADU on a contract parcel is typically NOT compatible and may require contract non-renewal (a 9-year wind-down) before an ADU can be built for non-agricultural rental. Farm-employee ADUs and immediate-family ADUs are commonly found compatible. Owners should confirm Williamson Act status via the county parcel viewer before ADU design.
  • Airport Land Use Compatibility Plans (ALUCP) — SACOG Airport Land Use Commission — An ADU in an ALUCP safety zone (Zones 1-6) may face density restrictions, avigation-easement recording requirements, and noise-attenuation construction standards (STC-rated windows, forced-air HVAC with acoustic treatment, soundproof attic insulation) for the 60/65/70 dB CNEL noise contours. Within the Mather Field AIA, the Board of Supervisors has historically applied the Mather ALUCP strictly; owners should verify AIA / safety-zone / noise-contour status on the SACOG ALUC maps before ADU design.
  • Natomas Basin Habitat Conservation Plan (NBHCP) — An ADU in the Natomas Basin must pay the NBHCP mitigation fee in addition to the standard county fee package. The mitigation fee funds habitat acquisition and management protecting giant garter snake, Swainson's hawk, and other listed species. Owners should confirm in-basin status on the county parcel viewer and obtain a NBHCP fee quote from the Natomas Basin Conservancy before finalizing the ADU budget.

County permitting (unincorporated parcels)

The Sacramento County Department of Community Development — Planning & Environmental Review (PER) and Building Permits & Inspection (BPI) divisions — is the single-point-of-contact for ADU permits on parcels in unincorporated Sacramento County. The unincorporated area covers approximately 596 square miles (roughly 59% of the county's 994 sqmi land area) and includes densely developed urban-fringe communities (Arden-Arcade, Carmichael, Fair Oaks, Orangevale, North Highlands, Rio Linda, Elverta, Antelope, Rosemont, Florin, Vineyard, Parkway, Fruitridge Pocket), suburbanizing unincorporated areas (Wilton, Herald, Sloughhouse, Rancho Murieta), rural agricultural districts (Delta communities of Walnut Grove, Ryde, Locke, Hood, Courtland, Clarksburg, Freeport), and foothill-transition lands near Folsom Lake (Gold River, Mather, Rancho Seco fringes). The seven incorporated cities — City of Sacramento, Citrus Heights, Elk Grove, Folsom, Galt, Isleton, and Rancho Cordova — permit their own ADUs independently. PER combines planning / zoning review, building plan review, grading and drainage review, fire-district referral (unincorporated areas are served by the Sacramento Metropolitan Fire District, Cosumnes CSD Fire Department, Galt FPD, Wilton FPD, Herald FPD, Courtland FPD, Walnut Grove FPD, or the River Delta FPD depending on location rather than a city fire department), and environmental review (CEQA is normally exempt for ministerial ADUs per Gov. Code 65852.2(f) and Pub. Res. Code 21080(b)(8)).

DepartmentSacramento County Department of Community Development — Planning & Environmental Review (PER) and Building Permits & Inspection (BPI)
Address827 7th Street, Room 225, Sacramento, CA 95814 (Planning); 827 7th Street, Room 102, Sacramento, CA 95814 (Building Permits)
Phone916-874-6141 (Planning) / 916-875-5296 (Building)
California state — ADU law and programs

State ADU law

California has the most aggressive statewide ADU preemption regime in the US, built from ~15 bills passed 2019-2025 and enforced by the Department of Housing and Community Development (HCD). The 2026 HCD ADU Handbook addendum (in effect with the 2025 Title 24 code cycle) is the operative state-level reference. The regime does four things at once: (1) preempts local zoning that would ban or unreasonably restrict ADUs; (2) imposes by-right ministerial approval with short statutory deadlines; (3) caps fees and utility-connection charges; and (4) empowers HCD to void non-compliant local ordinances.

State HOA preemption

California has the strongest statewide HOA-preemption regime in the US for accessory dwelling units, built from two bills: AB 670 (2019) voided ADU-prohibiting covenants on single-family residential lots, and AB 3182 (2020) extended and codified the preemption into the Davis-Stirling Common Interest Development Act (Civil Code §§ 4740 / 4741). The combination prohibits common-interest communities from banning ADUs, restricting rentals below 25% of separate interests, or treating ADUs as separate HOA interests. Limits remain: HOAs retain authority over reasonable design standards and statutory height limits, and the 2026 Carlsbad case (CalMatters coverage) established that an HOA's documented design-standards regime can effectively delay or constrain ADU approval short of outright prohibition.

State financing programs

California's flagship state-level ADU financing program — the CalHFA ADU Grant Program — is paused and has not been refunded since the original $100 million allocation was fully deployed 2023-12-28. The program provided up to $40,000 per qualifying homeowner for pre-construction and non-recurring closing costs and financed approximately 2,500 ADUs in two rounds. As of 2026-04, no new funding round has been announced in the state budget. CalHFA continues to publish anti-scam warnings because bad actors actively solicit homeowners claiming access to grant funds that no longer exist. State-level financing activity has shifted to local pilot programs (San Francisco, San Jose, Los Angeles, San Diego) and private financing products (Fannie Mae ADU mortgage, HELOC, construction-to-permanent).

State housing programs

California's state-level ADU programs are concentrated at HCD (technical guidance, ordinance review, enforcement) and the paused CalHFA grant pipeline (covered under stateFinancing). The state does not operate a central pre-approved ADU plan library — instead, AB 1332 (2024) created a preemption framework for local pre-approved plans with a 30-day ministerial-approval deadline, and major cities (Los Angeles, San Diego, San Jose, Sacramento, Berkeley) have rolled out their own plan catalogs. The California YIMBY coalition and other housing-policy organizations play an influential role in bill drafting; they are not state agencies but effectively drive much of the ADU legislative agenda. The Title 24 code cycle (now 2025, in effect for 2026 permits) is the authoritative building-code baseline.

Federal (United States) — ADU-relevant rules and programs

Federal ADU law

The United States has no federal statute that directly regulates accessory dwelling unit entitlement or design. Land-use authority over ADUs resides with states and local governments under the traditional police power. Federal engagement is limited to financing (Fannie/Freddie/FHA/VA/USDA), flood insurance (FEMA/NFIP), and discretionary housing programs (HUD), which are recorded in sibling sections of this file.

Federal financing programs

Federal housing-finance agencies and GSEs set nationwide underwriting rules that govern whether an ADU can be financed, appraised, and counted toward mortgage qualifying income. The relevant actors are Fannie Mae, Freddie Mac, FHA (HUD), VA, and USDA Rural Development.

Federal tax credits

There is no ADU-specific federal tax credit. ADUs may incidentally qualify for existing federal energy-efficiency and clean-energy tax credits when the ADU construction includes qualifying measures.

Federal housing programs

HUD administers several discretionary programs that can fund ADU-related activity at the grantee's election, but none is an ADU-specific program.

ZIP Codes

  • 95811
  • 95814
  • 95815
  • 95816
  • 95817
  • 95818
  • 95819
  • 95820
  • 95821
  • 95822
  • 95823
  • 95824
  • 95825
  • 95826
  • 95827
  • 95828
  • 95829
  • 95830
  • 95831
  • 95832
  • 95833
  • 95834
  • 95835
  • 95837
  • 95838
  • 95841
  • 95842
  • 95843
  • 95864

Post Office

  • 1618 Alhambra Blvd, 95816
  • 2000 Royal Oaks Dr, 95813
  • 2121 Broadway, 95818
  • 2801 Arden Way, 95825
  • 2929 35th St, 95817
  • 2929 Fulton Ave Ste 19, 95821
  • 3817 Marysville Blvd, 95838
  • 4301 Brookfield Dr, 95823
  • 4401 Gateway Park Blvd Ste 130, 95834
  • 4750 J St, 95819
  • 5410 Stationers Way, 95842
  • 5420 Kohler Rd, 95841
  • 5930 S Land Park Dr, 95822
  • 6024 44th St, 95824
  • 7250 Elk Grove Florin Rd, 95829
  • 9500 Kiefer Blvd, 95827

Locale Names